Pod format
Lobby Pod
The 24/7 store that slips onto your amenity floor.
180 sqft
Footprint
~150 SKUs
Assortment
4 hours
Install
A luxury-grade, walk-in store for multifamily mid-rise and high-rise. It sits on your existing amenity floor and installs in about four hours with zero construction.
Deployment
Installs in 4 hours on the existing floor. Zero construction.
Best for
- Class A multifamily
- Mid-rise & high-rise
- Amenity floors & lobbies
180 sqft
Footprint
~150 SKUs
Assortment
4 hours
Install
A moment in the day
What residents actually do with a pod.
Four moments. One lever for resident satisfaction, retention, and review-site sentiment.
The run-out-of-coffee morning
Maya needs cold brew before her 8 AM. The pod is on her way to the elevator. She taps in, grabs a Chameleon, and walks out in 18 seconds.
17 min saved vs. driving to a c-store
The forgot-dinner evening
Daniel got home late. Factor meals, fresh yogurt, and prepared bagel sandwiches are waiting in the pod. Dinner without leaving the building.
Zero trips outside
The mid-show snack
Priya is binging a new series. She walks 30 seconds to the pod for ice cream and a snack. Back on the couch before the credits roll.
30-second round trip
The Tylenol run
Solomon wakes up with a fever. The CVS down the street closed at 10 PM. The pod has Tylenol, Pedialyte, and basic OTC.
The friction of being sick, gone
Explore in 3D
Spin it. Look inside.
Drag to rotate the Lobby Pod. Scroll to zoom in on the real thing.
Let's put a pod
on your property.
Now installing Lobby Pod. Q4 2026 install window open. First pod live in 90 days from pilot signature.



